Calibration Data:



Adjustment conditions
Test oil   ISO4113 or {SAEJ967d}
1404 Test oil
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe mm   6-2-600
Outer diameter - inner diameter - length (mm)
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)   R
Right


Injection timing adjustment
Direction of rotation (viewed from drive side)   R
Right
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.5 4.45 4.55
Beginning of injection position   NO.1
Governor side
Difference between angles 1 deg.   45 44.5 45.5
Cyl.1-2
Difference between angles 2 deg.   90 89.5 90.5
Cal 1-7
Difference between angles 3 deg.   135 134.5 135.5
Cal 1-3
Difference between angles 4 deg.   180 179.5 180.5
Cal 1-4
Difference between angles 5 deg.   225 224.5 225.5
Cal 1-5
Difference between angles 6 deg.   270 269.5 270.5
Cal 1-6
Difference between angles 7 deg.   315 314.5 315.5
Cal 1-8


Injection quantity adjustment
Adjusting point   -
Rack position   9.9
Pump speed r/min   800 800 800
Each cylinder's injection qty mm3/st.   108 104.9 111.1
Basic   *
Fixing the rack   *


Injection quantity adjustment_02
Adjusting point   D
Rack position   8.4+-0.5
Pump speed r/min   200 200 200
Each cylinder's injection qty mm3/st.   20 17 23
Fixing the rack   *


Injection quantity adjustment_03
Adjusting point   A
Rack position   9.9+-0.5
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   108 107 109
Fixing the lever   *


Injection quantity adjustment_04
Adjusting point   B
Rack position   9.9+-0.5
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   110.5 108 113
Difference in delivery mm3/st.   8.8 8.8 8.8
Fixing the lever   *


Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   160 140 180
Fixing the lever   *
Remarks  
After startup boost setting


Timer adjustment
Pump speed r/min   500+120- 100
Advance angle deg.   0 0 0
Remarks  
Start


Timer adjustment_02
Pump speed r/min   800
Advance angle deg.   1.5 1 2


Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   3.2 2.7 3.7


Timer adjustment_04
Pump speed r/min   1250
Advance angle deg.   6.5 6.5 7.5
Remarks  
Finish

Test data Ex:



Governor adjustment

Test data 101803-1220 N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL (2)Excess fuel setting for starting: SXL
----------
DL=8-0.2mm SXL=9.9+0.2mm
----------



Speed control lever angle

Test data 101803-1220 (1)Pump speed = aa (2)Pump speed = bb (3)Pump speed cc
----------
aa=1250r/min bb=250r/min cc=1200r/min
----------
a=5deg+-5deg b=10deg+-5deg c=4deg+-5deg



0000000901

Test data 101803-1220 F:Full load I:Idle (1)Stopper bolt setting (2)R = aa
----------
aa=9.5mm
----------
a=5.5deg+-5deg b=24deg+-3deg c=25.5deg+-3deg



0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+10r/min Ra=8.4mm
----------



0000001601 2-STAGE CHANGEOVER DEVICE

Test data 101803-1220 RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------




Have questions with 101803-1220?





Group cross 101803-1220 ZEXEL

Mitsubishi 

101803-1200    3126175032 
8DC7
101803-1210    3126170015 
8DC7
101803-1220    3126155023 
8DC7
101803-1230    3126159063  INJECTION-PUMP ASSEMBLY
8DC80W
101803-1240    3126159083  INJECTION-PUMP ASSEMBLY
8DC80A
101803-1250    3126174023  INJECTION-PUMP ASSEMBLY
8DC80A
101803-1260  9 400 616 203  3126174033  INJECTION-PUMP ASSEMBLY
8DC80A
101803-1270    3126174043 
8DC80A
101803-1280    3126159094  INJECTION-PUMP ASSEMBLY
8DC80A
101803-1290    3126174053 
8DC80AD
Back to top